Enhance operational efficiency and safety at a Manufacturing facility in Chelmsford
- Home
- 9
- Case Studies
- 9
- Manufacturing
- 9
- Enhance operational efficiency and safety at a Manufacturing facility in Chelmsford
Case Study
State-of-the-art loading bay system
In Chelmsford, a manufacturing facility was primed for an upgrade with a state-of-the-art loading bay system designed by Sprint Door Systems Ltd. The project centered on installing two hydraulic dock levellers with telescopic lips, ensuring compatibility with various truck heights, complemented by energy-efficient dock shelters and precise vehicle positioning aids like truck wheel guides and traffic lights. This installation significantly enhanced operational efficiency and safety. The addition of sectional doors with vision panels and comprehensive safety features like manual polychocks and LED dock lights ensured a secure, well-lit loading environment. These upgrades not only streamlined truck deliveries and loading processes but also boosted productivity and reduced energy consumption, demonstrating our commitment to enhancing manufacturing efficiency and sustainability.
South Enquiries
01923 350045
North Enquiries
0161 511 58 58